plop SPACEPHOTOS
 Untitled Document




   Accueil » Réf S05401 (détail)

 
Ma Planche Contact / Demande de Devis : $contenupl image(s)
Autre choix d'images dans ce thème
                        
Enregistrez gratuitement cette image
en 800 pixels pour usage maquette
(click droit, Enregistrer l'image sous...)



Réf : S05401

Thème : Astronautes Entrainement  (1725 images)

Titre : In the Operations and Checkout Building

Description : (La description de cette image n'existe qu'en anglais)

(01/31/2000) --- In the Operations and Checkout Building, STS-99 Mission Specialist Mamoru Mohri (Ph.D.), who is with the National Space Development Agency (NASDA) of Japan, waves as he waits for final suitup preparations before launch. Liftoff of STS-99, known as the Shuttle Radar Topography Mission, is scheduled for 12:47 p.m. EST from Launch Pad 39A. The SRTM will chart a new course to produce unrivaled 3-D images of the Earth's surface, using two antennae and a 200-foot-long section of space station-derived mast protruding from the payload bay. The result of the Shuttle Radar Topography Mission could be close to 1 trillion measurements of the Earth's topography. Besides contributing to the production of better maps, these measurements could lead to improved water drainage modeling, more realistic flight simulators, better locations for cell phone towers, and enhanced navigation safety. The mission is expected to last about 11days, with Endeavour landing at KSC Friday, Feb. 11, at 4:55 p.m. EST